Proposed working group charter: Agentic AI Trust Control Plane (ATCP) ===================================================================== Abstract -------- This contribution proposes a new FG-TIDA working group, the Agentic AI Trust Control Plane (ATCP), to hold ToR Annex A clause A.2.7 ("a reference architecture for the agentic AI trust control plane"), which no working group holds today. WG2 addresses the per-action decision, the data plane of trust; ATCP addresses the control plane: where the references those decisions rely on come from, how they are declared and graded, how the record of authority stays available and consistent where acts consult it, and what happens to acts already under way when it changes. The group is seeded by FG-TIDA/themes#18 and hosts, at their proposers' request, the workstreams of #5 (provenance of authority, with its draft charter in PR #15 adopted as it stands) and #42 (evidence quality and authorization validity); #41 may join later. It proposes seven deliverables, specifies requirements rather than encodings or protocols, and draws its interface with WG2 object by object in the joint issue FG-TIDA/themes#60. Proposed convener: Laurent Beaumois; proposed co-chair: Pam Dixon. Discussion: FG-TIDA/themes#59, #60 and PR #61. History ------- Version: 0.5 Document: Proposed working group charter: Agentic AI Trust Control Plane (ATCP) Approval: Not recorded. Template adaptation is not approval. Focus Group: TIDA Working Group / stream: NWI for Incubation Authors ------- Not supplied — administrator review required. Keywords -------- Not supplied — administrator review required. Foreword -------- This contribution is submitted to the ITU-T Focus Group on Trust and Identity for Humans and Agentic AI (FG-TIDA). Publication in the tracker records a submission and does not imply endorsement or approval by the Focus Group. This paragraph provides tracker context; the technical content below is retained from the source. FG-TIDA Working Group (proposed): Agentic AI Trust Control Plane (ATCP) ======================================================================= Charter Information ------------------- .. list-table:: :header-rows: 0 :widths: 30 70 * - **Charter version** - 0.4 * - **Date** - 2026-11-16 * - **Status** - Draft proposal for a new working group, submitted for the first FG-TIDA meeting (Paris, 30 November – 1 December 2026). Discussed in FG-TIDA/themes#59, #60 and #61. 1. Group Information -------------------- .. list-table:: :header-rows: 1 :widths: 38 62 * - Field - Content * - Working group name and acronym - Agentic AI Trust Control Plane (ATCP), provisional * - FG-TIDA theme(s) covered - ToR Annex A, clause A.2.7 (reference architecture for the agentic AI trust control plane); A.2.5 for the two-regime case in Workstream A. Seed theme FG-TIDA/themes#18. Workstreams from FG-TIDA/themes#5 and #42, joined at their proposers' request. FG-TIDA/themes#41 may join at a later stage, if its proposers wish. * - Chair(s) / co-chairs - Laurent Beaumois (MeetLoyd), proposed convener. Pam Dixon (World Privacy Forum), proposed co-chair. * - Editor(s) of the main deliverables - D1: Laurent Beaumois and Pam Dixon. D2: Pam Dixon. D4: Xinghua Zhao (individual capacity). D5 and D7: Laurent Beaumois. D3: open, from the contributors to FG-TIDA/themes#18. D6: open, if #41 joins. * - Mailing list - To be assigned by the TSB secretariat * - Repository and issue tracker - Discussion: https://github.com/FG-TIDA/themes/issues/59. Interface with WG2: https://github.com/FG-TIDA/themes/issues/60. Charter draft: https://github.com/FG-TIDA/themes/pull/61. A working group repository is to be created if the group is formed. * - Charter status and version - Draft proposal, version 0.4 2. Background and Problem Statement ----------------------------------- ToR clause A.2.7 calls for "a reference architecture for the agentic AI trust control plane", covering technical-policy decision points, technical-policy enforcement points, "trust signal propagation across agent hierarchies", and "the coordination mechanisms required to maintain consistent trust state in distributed and multi-agent environments". No working group holds A.2.7 today. FG-TIDA WG2 addresses the per-action side: one action, checked at the moment it is taken against a pinned, authored reference. In networking terms, that is the data plane of trust. The control plane is everything those checks rely on but do not produce: where authority originates and with what standing; which operator, mode and regime are declared, and how far behaviour has drifted from them; how good the evidence behind a reference is, as distinct from whether the authorization is valid; whether the record of authority is available and consistent wherever an act consults it; and what happens to acts already under way when that record changes. The parties who have the problem are operators of agent estates, relying parties, and the people agents act for. An estate typically runs agents on several vendors' platforms, often on infrastructure the governing party does not control. Each platform has its own way to stop, suspend or revoke an agent, with its own semantics and its own notion of "done", and there is no shared interface through which an operator can issue one intervention with a known effect, or compare what each platform confirmed. Several themes describe parts of the loop: #13 coordinates responses across organisations, #16 governs the human decision to hold, intervene or resume, and #26 bounds the interval between evaluation and actuation. None of them owns the availability and consistency of the record at the points where acts consult it, nor the effect of a decided change on acts already under way. 3. Goals -------- * The Working Group will **describe** a reference architecture for the agentic AI trust control plane (ToR A.2.7), drawn around its objects, with its interfaces to WG1, WG2 and the related themes. * The Working Group will **specify requirements** for act-time consultation and run-time consistency of the record of authority, and for the evidence on which references rely. * The Working Group will **host**, at their proposers' request, existing themes that define the references the data plane consumes. Each workstream keeps its own editors and adopts its existing drafts as they stand. * The Working Group will build on existing work rather than duplicate it, in particular the per-action requirements of WG2, IETF RATS, WIMSE and OAuth 2.0 Token Exchange, the OpenID Shared Signals Framework, and W3C Verifiable Credentials. * The Working Group will not define encodings, wire formats or protocols, and does not address AI governance as such. 4. Scope and Non-Goals ---------------------- In Scope ~~~~~~~~ * **Reference architecture (A.2.7).** The objects of the control plane (the grant of authority and its record, the declared operator, the evidence that references rely on, the requirements arising from governance, and the record as consulted at act time); the functions that author, grade and keep them current; the demarcation with WG2; and the interfaces with WG1, #1, #13 and #16. D1 examines an interface with #13's collective interpretation function (F2), through which a receiving participant can qualify material dependencies, declared limits and unresolved conditions affecting reliance on results composed from several sources. Source-owned trust state, receiving-party qualification and the applicable WG2 decision remain distinct. Whether the interface needs any requirement beyond the existing objects is decided by the comparison in FG-TIDA/themes#60. * **Clusters of agents.** Two positions are on the record and are kept explicit: the cluster as the domain over which a collective-choice operator is declared (#18), and the principal sitting with the mandate rather than the cluster (#9: "a cluster composes mandates; a cluster itself authors none"). The architecture states what a cluster is for control purposes and where accountability sits. * **Workstream A, provenance of authority (#5).** *Object: the grant of authority, its origination, standing, content and composition.* The draft charter in FG-TIDA/themes PR #15 is adopted as it stands, with its own pen, as a named deliverable, with FG-TIDA/use-cases#9, #10 and #46. Enforcement of revocation remains outside this workstream, as its charter states. * **Workstream B, declared operators and drift (#18).** *Object: the collective-choice operator a system declares, with its regime, mode and transition conditions.* Internal assessment (the operator catalogue and its declaration), external evaluation (drift measured against the declaration), and regulatory alignment (the regulatory bridge, worked against at least two frameworks, one of them non-European). Results feed back into XSTR.magAI-behavior. * **Workstream C, evidence quality and authorization validity (#42).** *Object: the evidence a reference relies on, and its grade.* Two axes, kept separate in every deliverable: the quality of the evidence and the validity of the authorization. "Evidence absent" and "evidence found wrong" are different failures with different remediations, and are never merged. The grading vocabulary is a deliverable of this workstream, assessed against existing proposals. The per-action gate verdict stays with WG2, and #43 remains WG2's interface. * **Workstream D, technical requirements arising from governance (#41),** at a later stage, if its proposers wish. *Object: the technical requirements that governance places on trust and identity mechanisms*, anchored in A.2.1, A.2.4 and A.2.5. * **Workstream E, act-time consultation and run-time consistency.** *Object: the availability and consistency of the record of authority and of decided changes (revocation, intervention, mode change) where acts consult it, and the copies of it held there.* Workstream A specifies the record's content and how it changes; this workstream specifies its availability where it is consulted; WG2 specifies what the decision does with what it read. In particular: * the reach of a decided change: which acts, agents and delegated workers it concerns; * whether each act consulted the record, and evidence of that, independent of the component that acknowledged the change; * how stale a copy may be, what an act does when it cannot reach the record, how two copies that disagree are detected, and observe-before-enforce transitions; * acts already under way when the record changes, including delegated workers fanned out from one agent: the operation boundaries, and the records left at each check, are WG2's (see #60); this workstream specifies what happens inside one operation when the record changes, including its interruption and the time to effect, and the reach of a change to operations and workers on platforms where the enforcement point does not sit inside the operation; * re-evaluation when new evidence arrives or the version of a policy reference changes (the non-monotonic case raised on #33); * time to effect, measured as whether and when the next act stopped, not as time to acknowledgement; * a common intervention interface that agent platforms could honour, and a vocabulary of coverage levels. * **Shared fixtures.** Versioned act-time consultation, re-evaluation and intervention cases with expected outcomes and negative controls, aligned with TIDA6-FX and usable on the UC-4 testbed, including the kill-switch conformance drill proposed on #13, run on FG-TIDA/use-cases#46. Cases from other themes are welcome as candidates, reviewed jointly with their authors. Out of Scope / Non-Goals ~~~~~~~~~~~~~~~~~~~~~~~~ * The verdict on a single action, delegation treated as a series of per-action decisions, the operation contract, and the content of the decision record are addressed by FG-TIDA WG2. * Remote attestation mechanisms are addressed by FG-TIDA WG1; attestation results are inputs here. * The record-side requirements of decision records, and reconstruction after the act, are addressed by FG-TIDA/themes#1. * The human decision to hold, intervene or resume, oversight semantics, and the release of escalated actions are addressed by FG-TIDA/themes#16. * Signals, corroboration and response coordination across organisations, the cross-party blast-radius graph, and the kill-switch specification itself are addressed by FG-TIDA/themes#13. * Trust at component interfaces and in the execution sandbox is addressed by FG-TIDA/themes#53 and #54. * The design-time method for choosing operators is addressed by ITU-T SG17 Question 1/17 (X.dmst). * The Working Group will not define encodings, schemas, wire formats or protocols. * The Working Group will not address AI governance as such, nor map or assess national regimes, which the ToR excludes. * The Working Group will not rank, certify or recommend products. * Themes not listed as workstreams do not move into this group; interfaces with them are drawn with their proposers. 5. Programme of Work and Deliverables ------------------------------------- .. list-table:: :header-rows: 1 :widths: 6 29 45 20 * - # - Deliverable - Short description - Input documents * - 1 - Agentic AI trust control plane: problem statement and reference architecture (Technical Report) - Terminology delta, threat cases, the objects and functions of the control plane, the demarcation with WG2, the treatment of clusters, and the interfaces with WG1, #1, #13 and #16. The common frame the other deliverables are assessed against. - ToR A.2.7; FG-TIDA/themes#59, #60, #18, #36; submitted use cases * - 2 - Provenance of authority (deliverables D1–D5 of the #15 draft charter) - As defined in FG-TIDA/themes PR #15, unchanged. - FG-TIDA/themes#5, #9, PR #15; FG-TIDA/use-cases#9, #10, #46 * - 3 - Declared operators and drift: internal assessment, external evaluation, regulatory alignment (Technical Report) - Operator catalogue and declaration, drift measurement against the declaration, and the regulatory bridge. - FG-TIDA/themes#18; XSTR.magAI-behavior; X.dmst * - 4 - Evidence quality and authorization validity: requirements (Technical Specification) - Two separate axes, failure classes, and grading along a chain of hops. - FG-TIDA/themes#42, #43, #7 * - 5 - Act-time consultation and run-time consistency of the record: requirements (Technical Specification) - Reach of a decided change, consultation evidence, staleness, reachability and disagreement between copies, acts under way, re-evaluation, time to effect, a common intervention interface, and coverage levels. - ToR A.2.7; FG-TIDA/themes#60, #13, #16, #26, #33, #50, #53, #54 * - 6 - Technical requirements arising from governance (Technical Report), if #41 joins - Scope and timing to be set with the proposers of #41. - FG-TIDA/themes#41 * - 7 - Control-plane fixtures (Technical Report with a versioned fixture set) - Consultation, re-evaluation, intervention and mode-change cases with expected outcomes and negative controls, and drill results under the #13 conformance drill. - TIDA6-FX; UC-4 testbed; FG-TIDA/use-cases#21, #46 6. Milestones ------------- .. list-table:: :header-rows: 1 :widths: 30 70 * - Target date - Milestone * - First meeting, Paris (2026-11 / 2026-12) - Charter presented, with the workstreams that have joined (#5, #42) and those still open (#41). Outline of D1 available. * - Second meeting, Geneva (2027-01) - First draft of D1. Outlines of D4 and D5. Fixture set v0.1 aligned with TIDA6-FX. * - Third meeting (2027) - D1 agreed by the Working Group. First drafts of D3, D4 and D5. First drill results in D7. * - Fourth meeting (2027) - D4 and D5, the two Technical Specifications, agreed together and submitted to the FG-TIDA plenary, with D7. * - Final meeting - Remaining deliverables agreed and submitted to the FG-TIDA plenary, on the schedules their workstreams set. 7. Coordination, Dependencies and Liaisons ------------------------------------------ .. list-table:: :header-rows: 1 :widths: 35 65 * - Group / Organization - Coordination or dependency * - FG-TIDA WG2 (IBEA) - The control-plane / data-plane line. WG2 consumes the references defined here and returns verdicts (notably escalate and indeterminate) that may trigger a control-plane change. The interface inputs are listed by object in the joint issue FG-TIDA/themes#60. * - FG-TIDA WG1 (CDRA) - Attestation results as inputs to control-plane changes and coverage levels. * - FG-TIDA WG0 - Terminology and use cases. * - FG-TIDA/themes#1 - Record-side requirements for decision records, and records of what the control plane changed and when. * - FG-TIDA/themes#13 - Signals as inputs; evidence of the effect of an intervention, which #13 can read back. D1 examines an interface with #13's collective interpretation function (F2) for results composed from several sources. * - FG-TIDA/themes#16 - Decides on hold, intervention and resumption; this group evidences whether the next act honoured the decision. * - FG-TIDA/themes#23, #26, #29, #53, #54 - Enforcement points, privilege lifecycle, governed connections, interfaces and sandboxes: interfaces to be agreed with their proposers. * - ITU-T SG17 Q1/17 and Q16/17 - X.dmst (design-time declaration) and XSTR.magAI-behavior, complemented without duplication; results of Workstream B feed back. * - IETF RATS and WIMSE; OpenID SSF / CAEP; W3C VC and PROV-O - Followed and reused where applicable. No liaison has been established. 8. Terminology -------------- The Working Group will use the common FG-TIDA terminology where applicable. Should the Working Group define new terminology, this shall be communicated to the FG-TIDA terminology & use cases WG that maintains the common terminology repository. .. list-table:: :header-rows: 1 :widths: 30 70 * - Term - Meaning * - Trust control plane - The functions that author, grade and keep current the references on which per-action trust decisions rely, and that keep the record of them available and consistent where acts consult it (ToR A.2.7). * - Trust data plane - The per-action checking of agent actions against those references (the scope of WG2). * - Decided change - A revocation, intervention or mode change decided by a party with standing, recorded as a change in the record of authority. * - Time to effect - The interval between a decided change and the first act that honours it, at every enforcement point concerned, established independently of the component that acknowledged the change. * - Coverage level - A statement of how far an agent is governed, from observed only to governed end to end. 9. Use Cases ------------ The Working Group will use the use cases contributed to FG-TIDA, in particular FG-TIDA/use-cases#9, #10, #21 and #46. Three illustrate its scope: * **Revocation across a fan-out.** A delegating authority is revoked while an agent has dispatched many workers, some on another vendor's platform. Every worker must stop acting under it, with a known time to effect and evidence per enforcement point. * **Mode change from an external signal.** A cyber defence centre raises an alert, and an operator's estate must move from its normal to its critical mode, as in the example on FG-TIDA/themes#18, with attribution and a known reach. * **Agent built on another party's platform.** An enterprise must stop or narrow an agent it did not build and does not host, and must state honestly how far it governs that agent. New use cases shall be communicated to the FG-TIDA terminology & use cases WG that maintains the common use cases repository. 10. Working Methods ------------------- The Working Group works as a set of workstreams under one common reference architecture. Each workstream keeps its own editors and adopts its existing drafts as they stand. The interface with WG2 is maintained in one joint issue held by both groups (FG-TIDA/themes#60), listing each object once with the group that specifies it and those that consume it. Open questions for the first meeting: * **The line between Workstreams A and E:** where the record of authority ends and its consultation at act time begins, including for acts already under way when the record changes. * **The WG2 interface:** worked in FG-TIDA/themes#60. * **The common mental model:** how this group sits in the overall FG-TIDA picture, and in the layered model of the agent identity and trust stack. * **Clusters:** what a cluster is for control purposes, and where accountability sits when the operator is declared per cluster but authority is conferred per mandate. * **#41, #23 and #29:** a workstream here, or an interface? * **ToR A.2.2** (a trust lifecycle framework for agentic AI): not mapped by this charter. Where it belongs is to be decided with the themes that work on lifecycles (#23, #38–#40). * **Results composed from several sources:** does the interface with #13's F2 examined in D1 need any requirement beyond the existing objects? Decided by the comparison in #60. * **The common intervention interface:** what is the smallest one that agent platforms could honour? 11. Security and Privacy Considerations --------------------------------------- The control plane is itself a high-value target. A forged change is a denial of service, a suppressed change is a loss of human control, and a forged mode change can relax a whole estate at once. The deliverables must therefore address attribution and standing for every decided change (with #5), least privilege and stronger approval for broad changes, the integrity of the evidence of effect, the choice between failing closed and failing open when the record cannot be reached, and agents that attempt to evade or duplicate their own control plane, an open question raised on #18. Estate inventories and coverage statements reveal an organisation's structure and dependencies; their disclosure to evaluators and regulators must be minimised. 12. Success Criteria and Conclusion ----------------------------------- The Working Group will have completed its chartered work when deliverables D1, D3, D5 and D7, and those of the joined workstreams, have been submitted to the FG-TIDA plenary. Following completion, the deliverables may be offered to ITU-T SG17 Questions 1/17 and 16/17, or to other standards bodies, as the Focus Group decides. 13. Revision History -------------------- .. list-table:: :header-rows: 1 :widths: 18 22 60 * - Version - Date - Change * - 0.1 - 2026-11-04 - Working group proposal opened as FG-TIDA/themes#59 * - 0.2 - 2026-11-06 - Charter draft as FG-TIDA/themes PR #61: each workstream names its object; #5 and #42 joined as workstreams; joint interface issue with WG2 opened (#60) * - 0.3 - 2026-11-13 - Aligned with version 2 of the joint table in #60; D4 and D5 share one target; A.2.2 and results composed from several sources added as open questions; reach of a decided change added to Workstream E. Converted to the FG-TIDA charter template for submission to the TIDA DataTracker * - 0.4 - 2026-11-16 - D1 examines an interface with #13's collective interpretation function (F2). Workstream E aligned with version 3 of the joint table in #60: the operation boundaries are WG2's; Workstream E keeps what happens inside one operation, its interruption and time to effect, and the reach of a change to other platforms Original front matter --------------------- .. raw:: latex \pagestyle{plain} \thispagestyle{plain} .. _wg-charter: