Skip to main content

Trust-to-Action-to-Outcome Operability: a candidate downstream gap between trusted authorization and verifiable execution

Editorial template adaptation — author verification pending. The original submission remains available in the version history. Authors should compare this version with their original and submit corrections if needed. Missing information is explicitly marked for author/editor review; this version is not fully template-compliant.

Contribution number FG-TIDA-INCUBATION-016

Versions:

The recorded lifecycle state indicates the review and approval status of this item.
0.0
0.1
Recorded archive dates. Colours distinguish successive versions; they do not indicate approval or expiry.

Repository creation follows working-group adoption.

Archived versions

Compare versions

VersionRecordedGitHub tagRelease artifacts
0.02026-11-23 09:58 UTC——
0.12026-11-25 19:15 UTC——

This reading preview includes the RST chapters and their referenced images. Download the source ZIP for the complete folder structure and supporting files. Submitted build configuration and diagram source files are not executed in this preview.

Abstract

Not supplied — administrator review required.

History

Version: 0.1

Document: Trust-to-Action-to-Outcome Operability: a candidate downstream gap between trusted authorization and verifiable execution

Approval: Not recorded. Template adaptation is not approval.

Focus Group: TIDA

Working Group / stream: NWI for Incubation

Authors

JH Kim, Interim Head, Standards Committee

Affiliation(s): KIPCC — Korea Intellectual Property Commercialization Council

Contact: info@kipcc.org

Keywords

Not supplied — administrator review required.

Foreword

This contribution is submitted to the ITU-T Focus Group on Trust and Identity for Humans and Agentic AI (FG-TIDA). Publication in the tracker records a submission and does not imply endorsement or approval by the Focus Group. This paragraph provides tracker context; the technical content below is retained from the source.

Trust-to-Action-to-Outcome Operability

FG-TIDA input document · KIPCC · Trust-to-Action-to-Outcome Operability

ITU-T FG-TIDA · INPUT DOCUMENT · SOURCE: KIPCC (REPUBLIC OF KOREA) Trust-to-Action-to-Outcome Operability: a candidate downstream gap between trusted authorization and verifiable execution

ITU-T Focus Group on Trust and Identity for Humans and Agentic AI (FG-TIDA) — Input document

This is a contribution to FG-TIDA. It represents the views of the contributor and does not represent an agreed position of FG-

TIDA, ITU-T Study Group 17 or ITU.

Item

Detail

Meeting

Meeting

Submitted for the 3rd interregnum preparatory e-meeting, 30 September 2026. The contributor will not attend that meeting and will introduce the document at the next preparatory e-meeting

Source

KIPCC — Korea Intellectual Property Commercialization Council, a non-profit association, Republic of Korea

Contact

JH Kim, Interim Head, Standards Committee, KIPCC — info@kipcc.org

Title

Title

Trust-to-Action-to-Outcome Operability: a candidate downstream gap between trusted authorization and verifiable execution

Purpose

Discussion

Keywords

Keywords

operability; operational state; executability; per-action authority; state transition; execution evidence; cross-layer; energy

Related ToR

Clauses 3.1, 3.3, 3.4, 4.1, 4.2, 4.5; Annex A.1.5, A.1.6, A.2.4, A.2.7, A.2.8

Related themes and

Complementary to themes #1, #5, #12, #16, #19, #20, #23, #26 and use case #9 (see clause 6). This contribution does not seek to displace or absorb any of them.

use cases

Document status

Document status

v1.2 — landscape review updated on 29 September 2026. Supersedes earlier drafts, which were not submitted.

Abstract. FG-TIDA addresses whether an actor should be permitted to act, on whose behalf and under what trust conditions. This contribution identifies a question that remains open after that determination: whether the permitted action can in fact be executed against a specific target entity in its current operational state, and whether the resulting state transition and outcome can be evidenced. It proposes the working term operability for this property, sets out a protocol-neutral boundary, and identifies two sub-areas — continuity of executability and evidence to the energy interface, and the effect of observation lag on admissible autonomy — for which the contributor has not found existing coverage. The contribution is offered as complementary input to existing themes and does not request a new Working Group, deliverable or editorship.

Core proposition

  • Trust determines whether an actor should be permitted to act.

  • Operability determines whether a permitted action can be safely, semantically, technically and verifiably

executed against a target entity in its current state, and whether the resulting state transition and outcome can be evidenced.

0. What this contribution does not claim

This clause is placed first deliberately. The contributor is a new participant in FG-TIDA and wishes to state the limits of the proposal before making any argument.

  • It does not propose a new identity, attestation, authentication, authorization, delegation or agent-

communication protocol, nor a new trust evaluation model. These belong to FG-TIDA, ITU-T SG17 and other identity and security bodies, and are consumed here as inputs.

  • It does not claim priority over any existing theme. Themes #1, #5, #16 and #23 already address parts of the

space discussed below. Where this contribution touches those areas it is offered as supplementary requirement material to the respective proposers.

  • It does not claim that the gap must be addressed inside FG-TIDA. Whether it belongs to FG-TIDA, another

ITU-T group or another standards body is what the contributor would like the group to discuss.

  • It does not present validated empirical results. The requirements in clause 4 are candidate formulations not yet

tested in a deployment.

  • It does not request a Working Group, an editorship or a deliverable.

1 / 6

FG-TIDA input document · KIPCC · Trust-to-Action-to-Outcome Operability

1. The remaining question

The FG-TIDA Terms of Reference cover agent identity, delegation artefacts, trust lifecycle management, runtime trust control, human oversight and behavioural trust evidence. Together these answer: may this actor act, on whose behalf, and under what conditions. A positive answer does not establish that the requested real-world operation is currently executable.

Setting

Setting

Trust question — resolved by FG-TIDA

Question that remains open

mechanisms

Enterprise procurement

Enterprise

The agent's identity, delegated spending limit and trust state are valid

Budget state, supplier eligibility, contract status, approval threshold and compliance holds may make this specific purchase inoperable now

procurement

Industrial / embodied

Industrial /

Identity is verified and the binding to controller and device is attested

A safety interlock, human presence, an equipment fault or an unsafe process state may make the commanded motion unsafe now

embodied

Energy / AI data centre

Energy / AI

The energy-management agent is identified, authorized and trusted to shift load

Grid reserve, protection state, thermal headroom, contractual demand limits and concurrent load actions may prohibit the requested transition

data centre

The distinction can be stated as four non-equivalences:

  • Capability does not imply operability.

  • Trust does not imply operability.

  • Authorization does not imply executability.

  • Execution without a verifiable state transition is incomplete operation — a control call returning success is not

evidence that the pump actually stopped.

2. Proposed conceptual boundary

Layer

Question

Where it is being addressed today

Capability

Capability

Can the model or agent perform the function in principle?

AI capability evaluations and standards

Identity and

Who or what is acting, on whose behalf, under what trust conditions?

FG-TIDA, ITU-T SG17 (Q10/17, Q16/17), IETF WIMSE and OAuth, OpenID, W3C

trust

Operability

Operability

Can this permitted action execute now, against this target, in this state, under all applicable constraints?

Candidate gap — subject of this contribution

Execution and outcome

What actually happened, what state changed, and what evidence proves it?

Partly theme #1; ISO/IEC 24970 (AI system logging) at system level; extension to per-action state and outcome proposed here

2.1 Candidate working definitions

Term

Candidate definition

Operability

Operability

A property of an authorized action indicating that it is semantically valid, technically executable and constraint-compliant for a specified target entity in its current state, with defined evidence obligations for execution, state transition and outcome

Operational state

The machine-readable current state of a target entity, together with the observation time and observation lag, sufficient to determine whether a given action is executable against it

Operational action contract

A machine-readable, per-action binding of actor, authority reference, target entity, intended action, preconditions, constraints, human gate, expected state transition, evidence obligations, validity window and rollback conditions

Operational truth

Evidence sufficient to reconstruct which actor, under which authority, performed which action against which target, what state transition actually occurred, and what outcome was observed

2.2 Boundary architecture

Upstream (trust domain)

Boundary (operability)

Downstream (execution domain)

Identity, attestation,

Resolve target entity and its current operational state

Tool, API, workflow, robot, facility, power system

authentication

2 / 6

FG-TIDA input document · KIPCC · Trust-to-Action-to-Outcome Operability

Upstream (trust domain)

Boundary (operability)

Downstream (execution domain)

Delegation, authorization,

Bind authority to an explicit per-action contract

Execute only after operational preconditions pass

trust state

Trust PDP/PEP, oversight

Apply state, resource, safety, policy and human- gate constraints

Observe the actual state transition

signals

Behavioural and trust

Define execution and outcome evidence obligations

Emit evidence bound to the action contract

evidence

The boundary is protocol-neutral. It consumes upstream outputs — for example OAuth or GNAP tokens, transaction tokens, AuthZEN decisions, verifiable credentials or payment mandates — and determines whether they are sufficient, together with target state and operational constraints, to permit execution.

3. Sub-areas that appear uncovered: continuity across layers

Theme #20 sets out a binding chain from the logical agent to the physical device and the responsible party, and asks what evidence establishes that an identified agent, acting under valid authority, controlled a physical system in a verified state. The contributor regards this as well posed and offers two supplementary observations.

Observation

Detail

Suggested handling

The chain does not currently extend to the energy layer

The chain does not currently

Many consequential agent actions terminate at an energy interface — data- centre load shaping, industrial process power, storage, thermal management. Constraints there (capacity, grid reserve, protection state, thermal headroom, demand limits) do not exist at the layers above and cannot be inferred from device state

Consider whether the binding chain and its evidence requirements should extend to the energy interface where one exists

extend to the energy layer

"Verified state" is required but not defined

The formulation presupposes machine- readable state semantics, including observation time and lag. Without it, relying parties in different trust domains cannot compare state assertions

Consider treating operational-state semantics as a prerequisite input to binding and attribution work

A property of the energy layer not present above it

Where the observation lag of the energy interface exceeds the time in which an action takes effect, the actor cannot know the state it is acting on

This is neither a security nor a trust property. It constrains the admissible degree of autonomy for that action, independently of how trustworthy the actor is

4. Candidate requirements for discussion

Candidate formulations, not proposed text. Each is annotated with its relationship to existing work so the group can see where it would duplicate rather than add.

ID

Candidate requirement

Relationship to existing work

O-

A trust or authorization result should not by itself constitute executable authority for an operational action

New framing; complements #5 and #23

REQ-

1

O-

An operational action should identify a target entity and the current-state assertions required for its execution, including observation time and observation lag

Prerequisite input to #20

REQ-

2

O-

Authority scope, trust-state validity and delegation constraints should be validated at the point of execution, not only at issue

Overlaps #5 and #23 — deferred to those proposers

REQ-

3

O- REQ- 4

O-

Action-specific technical, resource, safety, policy and human-review conditions should be evaluated before execution, and their combination should be non- compensatory

New framing

REQ-

4

O- REQ- 5

Human review should return a machine-readable operational disposition (approve, deny, constrain, hold, suspend, rollback, resume) with conditions for return to operation

Overlaps #16 — offered to #16 proposers

3 / 6

FG-TIDA input document · KIPCC · Trust-to-Action-to-Outcome Operability

ID

Candidate requirement

Relationship to existing work

O- REQ- 6

O-

Execution should produce evidence binding actor, authority, action, target, execution result and the observed state transition, referenceable from the per- action contract

Actor–authority–action portion overlaps #1 — deferred; state-transition portion offered as extension

REQ-

6

O- REQ- 7

Trust degradation or revocation should trigger defined re- evaluation, suspension or invalidation of affected executable actions, with a stated maximum propagation delay

Extends Annex A.2.7, #12 and #23

O-

Operability interfaces should remain independent of the underlying identity, trust and agent-communication protocols

New framing

REQ-

8

O- REQ- 9 ★

O-

Where an action reaches an energy or power interface, the constraints of that interface should be treated as executability preconditions of the same standing as safety constraints

No overlap identified

REQ-

9 ★

O- REQ- 10 ★

Where the observation lag of a layer exceeds the time in which an action takes effect at that layer, the admissible degree of autonomy for that action should be reduced accordingly

No overlap identified

★ marks the two requirements for which the contributor has not identified existing coverage. The other eight are offered on the understanding that the relevant theme proposers should decide whether they are useful.

5. Candidate use cases

#

Use case

Summary

Relation

5.1

Enterprise procurement agent

FG-TIDA mechanisms establish identity, delegation and trust. The operability boundary then evaluates budget, supplier eligibility, amount, contract state, compliance and required approval. Only an action contract whose preconditions pass is released. Evidence links principal, delegation, action, approval, transaction and the resulting accounting and inventory state change

No physical complexity; illustrates the distinction

5.2

Industrial or embodied agent

A trusted agent bound to a verified controller and device. The boundary resolves current safety state, operating envelope, human presence, fault conditions and rollback obligations before execution, then records the resulting physical state transition

Offered for joint consideration with #20

5.3

Energy or AI data-centre agent

An authorized energy agent requests a load shift. Validation considers equipment availability, grid reserve, protection state, thermal headroom, demand limits, concurrent actions and local human gates. Execution evidence is correlated with metering and equipment state. Grid-stability judgements are delegated to the grid-side system and consumed as results

No existing coverage found

5.4

Agent payment approval (relation to use case #9)

Use case #9 notes that requirements for what a grant from a natural person to an agent must contain, and how authority is determined at the time of action, are not found in existing documents. A payment mandate is one domain- specific instance of a per-action authority contract; the operability question adds whether the payment is executable now and what evidence of outcome is retained

Offered to the #9 proposer as supplementary material

The contributor intends to submit at least one of these to the use-case repository, subject to guidance on the current submission route.

4 / 6

FG-TIDA input document · KIPCC · Trust-to-Action-to-Outcome Operability

6. Relationship to current FG-TIDA work and adjacent standards

Area

Relationship

Contributor's position

Theme #1 — Accountability and attribution after an agent has acted

Theme #1 — Accountability and

Overlapping

Actor–authority–action evidence belongs to #1. Only the extension to observed state transition and outcome is proposed, and offered to #1 proposers

attribution after an agent has acted

Theme #5 — Provenance of Authority

Overlapping

Origin and travel of authority belongs to #5. Only the conditions under which authority becomes executable at a given moment are proposed

Theme #12 — Agent Trust Mechanics

Adjacent

Trust and runtime-assurance outputs are consumed. A shared trust-to-evidence hand-off interface would be useful

Theme #16 — Operational Human Oversight

Overlapping

Triggers and escalation belong to #16. Only the machine-readable operational disposition and return-to-operation conditions are proposed

Theme #19 — Lifecycle-Wide Privacy Protection

Adjacent

Minimum-disclosure principles should apply to execution evidence; the contributor would follow #19

Theme #20 — Trust and Identity Binding with Embodied Systems

Complementary

Operational-state semantics as prerequisite input; extension to the energy interface

Theme #23 — Authorization and privilege lifecycle (SG17 C676 proposal)

Overlapping at lifecycle level, complementary at action level

Lifecycle management belongs to #23. The per-action contract in 2.1 is offered as a possible lower-level object that such a framework could reference

Theme #26 — Cryptographic runtime enforcement boundary

Adjacent

Enforcement mechanisms are consumed; operability supplies the action-specific conditions to enforce

Use case #9 — national payment rail

Complementary

See 5.4

Annex A.1.6 — new conceptual layers

Annex A.1.6 — new conceptual layers

Directly relevant

Operability is offered as a candidate answer

Annex A.2.7 / A.2.8 — trust control plane, behavioural evidence

Consuming and extending

Downstream interface from trust decision to operability decision; evidence extended to execution and outcome

ToR 3.4 / 4.5 — assessment and benchmarks

Requires separation

Trustworthiness and operability assessment answer different questions and should remain distinct

ISO/IEC 24970 (AI system logging,

Adjacent

System-level logging, oversight and controllability are consumed; the per- action state-transition evidence discussed here is narrower

FDIS) · ISO/IEC 42105 (human

oversight, FDIS) · ISO/IEC TS 8200

(controllability)

IETF WIMSE agent authentication and

Consumed

Tokens and receipt infrastructure are used as-is; no new protocol is proposed

authorization (WG draft) · OAuth

Transaction Tokens · SCITT (RFC 9943,

RFC 9942)

ITU-T F.748.93 (AI agent

Adjacent

Interoperability framework is consumed

interoperability, SG21)

7. Proposed action

The meeting is invited to:

  • note the distinction between a trusted or authorized status and operational executability, and consider whether

operability, operational state and state-transition evidence are useful working vocabulary;

  • consider whether the question raised in Annex A.1.6 is usefully answered by an operability layer;

  • consider whether the two items without identified coverage — continuity of executability and evidence to the

energy interface, and the effect of observation lag on admissible autonomy — fall inside or outside the FG- TIDA scope;

5 / 6

FG-TIDA input document · KIPCC · Trust-to-Action-to-Outcome Operability

  • advise the contributor on the route for offering the supplementary material in clause 4 to the proposers of

themes #1, #5, #16, #20 and #23, and on the submission route for the use-case repository;

  • note that the contributor does not request a Working Group, deliverable or editorship at this stage.

7.1 Intellectual property

This contribution discloses conceptual and requirement-level material only; no implementation, algorithm, data schema or product specification is disclosed. GTL Korea Co., Ltd., which provided technical input to this contribution, holds pending patent applications that may relate to parts of the subject matter. The contributor is disclosing this at the earliest stage, and any necessary declaration will be made under the ITU-T/ITU-R/ISO/IEC common patent policy.

7.2 Limitations

  • The theme landscape review supporting clause 6 was updated on 29 September 2026 from the public

repository. Not every open theme could be reviewed in depth; correction is welcome.

  • The requirements in clause 4 have not been validated in a deployment. Results, including negative results, will

be reported once pilot data is available.

  • The energy-layer material in clauses 3 and 5.3 has not been applied to a live power system. It is a problem

statement, not guidance for power-system operation.

References

#

Reference

[1]

ITU-T FG-TIDA, Terms of Reference — https://www.itu.int/en/ITU-T/focusgroups/tida/Pages/ToR.aspx

[2]

[2]

ITU-T FG-TIDA main page and meetings — https://www.itu.int/en/ITU-T/focusgroups/tida/Pages/default.aspx · https://github.com/FG-TIDA/meetings

[3]

Recommendation ITU-T A.7, Focus groups: establishment and working procedures

[4]

FG-TIDA themes #1, #5, #12, #16, #19, #20, #23, #26 — https://github.com/FG-TIDA/themes/issues

[5]

FG-TIDA use case #9 — https://github.com/FG-TIDA/use-cases/issues/9

[6]

ISO/IEC FDIS 24970, Artificial intelligence — AI system logging

[7]

[7]

ISO/IEC FDIS 42105, Guidance for human oversight of AI systems · ISO/IEC TS 8200:2024, Controllability of automated AI systems

[8]

IETF draft-ietf-wimse-aims (WG draft) · draft-ietf-oauth-transaction-tokens

[9]

IETF RFC 9943, SCITT Architecture · RFC 9942, COSE Receipts

[10]

ITU-T F.748.93, Framework and requirements for AI agent interoperability

[11]

IETF RFC 9334, RATS Architecture · W3C Verifiable Credentials Data Model v2.0

6 / 6